28 September 2015 to 2 October 2015
Budva, Becici, Hotel Splendid, Conference Hall
Europe/Podgorica timezone

Magnetic measurement system for series production of NICA superconducting magnets. Data acquisition, control and data analysis.

29 Sept 2015, 10:50
15m
Budva, Becici, Hotel Splendid, Conference Hall

Budva, Becici, Hotel Splendid, Conference Hall

Speaker

Mr Vladimir Borisov (JINR)

Description

The Nuclotron-based Ion Collider fAcility (NICA) is the new accelerator complex being constructed at JINR. More than 250 superconducting (SC) magnets will be assembled and tested at the new test facility in the Laboratory of High Energy Physics JINR. Magnetic measurements system for NICA booster dipole magnets was built and commissioned at late 2013. First cryogenic measurements of dipole magnets was done at late 2014. Magnetic measurements system, its data acquisition and control system are described. Data analysis procidures and first results of cryogenic magnetic measurements are presented and discussed.

Primary author

Co-authors

Presentation materials