Speaker
Mr
Irakli Minashvili
(JINR, Dubna)
Description
Abstract: Tile Hadron Calorimeter maintenance was strarted on surface, before detector gone in PIT. Since 2004 till 2007 the commissioning for Front End (FE) end ROD electronics were carried out permanently. From 2009 up today we were performing annual (during the stop of the LHC) TileCal maintenance. As well there were two big FE electronics maintenance compaigns. The first -on 2006-2008, so called FE electronics Refurbishment and second one during LS1, so called Consolidation of all 256 drawers. There are discribed the problems detected during physics RUNs and ways for solution. Some recomatdations for detector upgrade are given.
Author
Mr
Irakli Minashvili
(JINR, Dubna)