9–16 Mar 2026
hotel "Mayak"
Europe/Moscow timezone

JUNO DCI production experience for first-year data taking

10 Mar 2026, 12:00
30m
hotel "Mayak"

hotel "Mayak"

Speaker

Xiaomei Zhang

Description

"The Jiangmen Underground Neutrino Observatory (JUNO) commenced physics data taking in August 2025, marking the transition from commissioning to full-scale operation of its Distributed Computing Infrastructure (DCI) system for real physics data. This contribution presents the Monte Carlo production and physics production experience accumulated during the first year of data taking.
We provide an overview of the production workflow, detailing the integration of the DCI system with the JUNO offline processing pipelines. We report production features and status, and describe the system’s operational mechanism, including task submission, workflow and dataflow, centralized monitoring, and failure recovery. Moreover, discrepancies between real data operations and prior Data Challenge campaigns will be mentioned, including increased data volume variability, unforeseen network problems, and higher-than-expected I/O demands. Bottlenecks—such as excessive job submission rates, SE and service performance constraints, and elevated job failure rates—were identified through detailed monitoring and resource profiling. Targeted mitigations include dynamic submission-rate throttling, infrastructure service upgrades, multi-hop transfer optimizations, and enhanced automated failure recovery.
These improvements have significantly boosted system reliability and throughput. The lessons learned offer critical guidance for sustaining long-term JUNO computing operations, inform optimal service deployment strategies."

Presentation materials