### straw readout
- mu2e time calibration
- TIGER time calibration
- 20mm straw at H8 dump
- to be moved + short cable
- data analysis previous TB TIGER at different rates
- single straw data - are all distances available?
### reference tracking
- noises
- LV
- before starting setter with new configuration check LV
- Vitally instructions
- overheating
- feedback Chiara
- thermovisor?
- connections
- new TIGER-OLD MM
- 15 x-boards ordered
- 7 to be soldered - in JINR
- LV cables and DLVPC - improvement not possible till September
- Check with Chiara if new FEB can be expected
- MM removed
- to be picked up from Givi by mid-end Augusts
- HV distribution for MM
- up to 5 kV >= 3 filter boxes
- check nominal with the existing box
- Documentation TIGER calibration
- procedure
- results
- recabling - mid of August (with 3rd GEMROC)
- may be alignment of MM?
- Dima: summary of MM positions → will decide to align or not depending on that
- end of year: patch panel + LV cables